04.1.1
Protein and food processing
Process it where the feed is grown.
04.1.3
The investment case
47 percent of Canada's live-pig exports leave from Manitoba.
They leave as animals, and the margin gets added somewhere else. Every step taken here is value that stays in the province.
PROVINCE OF MANITOBA. FURTHER PROCESSING, RENDERING AND PACKAGING ARE THE STEPS MOST OFTEN MISSING INSIDE THE CLUSTER.
04.1.5
Share of the country
Manitoba raises 29 of every 100 hogs in Canada.
The feed, the barns and the primary producers sit inside your delivery radius. That is why a processor looks here first.
PROVINCE OF MANITOBA HOG SECTOR DATA, 2024. ONE SQUARE IS ONE PERCENT OF NATIONAL PRODUCTION.
04.1.6
Already here
Who you would be operating beside.
-
01
HyLife
Fully integrated premium pork, from its own feed mill through to finished product shipped worldwide including Japan. Head office in La Broquerie.
-
02
Bothwell Cheese
New Bothwell, with a national reputation built out of a village.
-
03
Exceldor
Poultry processing inside the same cluster.
-
04
The suppliers
Feed, barns, equipment dealers, specialised livestock transport, packaging and industrial construction that has already built to food grade.
04.1.7
The gaps
Six capabilities companies here currently buy elsewhere.
Ask us which companies buy each of these outside the region today and we will put you in the room with them.
-
01
Further processing
Value-added product made here instead of shipped raw.
-
02
Plant-protein fractionation
The category Protein Industries Canada exists to grow.
-
03
Byproduct and rendering capacity
Raised repeatedly by processors here.
-
04
Cold and controlled storage
Thin relative to the processing volume nearby.
-
05
Food-grade packaging
Largely trucked in.
-
06
Applied food science
No facility inside the cluster itself.
04.1.8
The constraint
Water and wastewater decide wet processing.
For a water-intensive process in this region these two lines decide your project. Take the file, and take it early.
Water
Natural spring water from the regional water table. It has supplied this region's processors for generations. Ask for the current assay, quality profile and available volumes.
Wastewater
Capacity is constrained and it is the region's active infrastructure project. Ask for this month's status.
Raise a water-intensive process in the first conversation. It will either work here or it will not, and we would both rather know in week one.
04.1.9
Next
Bring us the flow numbers.
Throughput, water draw, effluent load, power, headcount. That is the first email. Everything else follows it.